Trucks + warehouse
How to stage freight for morning delivery routes
If drivers wait at the dock every morning, the problem usually started the afternoon before. Here is a simple way to stage and load freight overnight so trucks leave on time and drivers find the right pallet at every stop.
By Yauheni Pachka, founder of SimpleDocks
Updated
In short
- Lock tomorrow's routes in the afternoon. The dock can't stage freight for a route that keeps changing.
- Load in reverse stop order: last stop goes in first, against the nose; first stop goes in last, by the doors.
- Label every pallet with its stop number, big enough to read from the trailer doors.
- Check each trailer against its stop list before the driver arrives, not while they wait.
Step by step
- 1. Close the routes. Pick a cut-off time (for example 3 PM). Freight that arrives later goes on the next day's routes or a late add with the dispatcher's okay.
- 2. Give each route a staging lane. Tape a lane on the floor near its door, or use a door number, and stage that route's pallets there.
- 3. Sort inside the lane by stop. Put pallets for each stop together and label them: stop 1, stop 2, and so on.
- 4. Load in reverse. Last stop first, against the nose. Heavy pallets low and spread along the trailer.
- 5. Check before the doors close. Count pallets per stop against the list. Write down anything short or damaged now, not at the customer.
- 6. Park it ready. Move the loaded trailer to the yard or leave it at the door, and tell dispatch which trailer holds which route.
Common problems and fixes
| Problem | Fix |
|---|---|
| Driver can't reach stop 1's pallet | Load in reverse stop order; first stop by the doors |
| Wrong pallet delivered | Label by stop number and customer name, checked at loading |
| Late add-ons break the plan | A route cut-off time and one person who approves exceptions |
| Trailer not ready when driver arrives | Load the night before; the morning crew only fixes exceptions |
| Nobody knows which trailer is which | Record trailer number per route when it's loaded |
How SimpleDocks helps
In SimpleDocks you build each trip by picking the loads and a trailer, and the app shows how many floor spots it uses. The forklift crew gets the loading job on their phone while the trailer is at the door, and the trip can't leave while that work is still open. The driver then sees one stop at a time, with directions and proof of delivery at each.
See a trip built from loads on the floor.
Try the live demoKeep reading
- Loading guideHow many pallets fit in a 53-foot trailer?
- Trucks + warehouseHow to run a trucking company with its own warehouse
- Loading guideHow many pallets fit in a 48-foot trailer?
- Trucks + warehouseHow to have outbound trailers ready before drivers arrive
Questions
Should you load delivery trucks the night before?
Usually yes. Loading overnight means drivers leave at the start of their shift instead of waiting for the dock.
What does load in reverse stop order mean?
The last delivery goes in first, at the front of the trailer, and the first delivery goes in last, by the doors, so each stop's freight is the next thing the driver reaches.
How do you label pallets for routes?
Stop number and customer name on two sides of the pallet, large enough to read from the trailer doors.
What if freight arrives after the route is planned?
Set a cut-off time. Late freight goes on the next route unless one person approves adding it.
More from SimpleDocks
- What is cross-dock software?
- Cross-dock software for small warehouses that run their own trucks
- How to price cross-dock handling and storage
- How to charge for pallet storage at a cross-dock
- Cross-docking vs transloading
- Dock appointment booking for small warehouses
- How to cut truck wait time at a small warehouse
- How to start a cross-dock business
- OS&D: over, short and damaged freight
- Proof of delivery for small fleets
- How many dock doors do you need?
- SimpleDocks vs Opendock
- SimpleDocks vs Roadmark
- SimpleDocks vs CartonCloud
- SimpleDocks vs ProDocks
- SimpleDocks vs LoadingCalendar
- SimpleDocks vs DataDocks
- SimpleDocks vs GoRamp
- SimpleDocks vs Rush Hour
- Opendock alternatives for small warehouses
- How many pallets fit in a 53-foot trailer?
- How many pallets fit in a 48-foot trailer?
- How many pallets fit in a 26-foot box truck?
- How many 48×48 pallets fit in a 53-foot trailer?
- How many pallets fit double stacked?
- How to run a trucking company with its own warehouse
- How to have outbound trailers ready before drivers arrive
- What to do when a linehaul truck arrives late
- How dispatchers and forklift crews can work together
- How much to charge to unload or load a truck
- How to price pallet restacking and freight rework
- How to stop losing money on unbilled warehouse work
- How to invoice cross-dock customers
- Free cross-dock rate sheet maker
- Trailer pallet calculator